Agenda item

D03 - F/TH/19/1231 - Land North East Of The Length, St Nicholas At Wade

Minutes:

PROPOSAL: Erection of 34No. dwellings, together with associated landscaping, parking and access.

 

It was proposed by the Chairman and seconded by the Vice Chairman:

 

“THAT the officer’s recommendation be adopted, namely:

 

To defer and delegate for approval subject to the satisfactory completion of Section 106 agreement within six months of the date of this resolution securing the required planning obligations as set out in the Heads of Terms, and safeguarding conditions:

 

1  The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

GROUND;

In accordance with Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Purchase Act 2004).

 

 2  The development hereby approved shall be carried out in accordance with the submitted drawings numbered 0001 Rev P03, 0002 Rev PO3, 0222/19/B/20 Rev B, 0222/19/B/21 Rev C, 010, 011, 016, 017, 020, 025 and 026 received 11th September 2019, 012 Rev A, 013 Rev A, 014 Rev A, 015 Rev A, 018 Rev A, 019 Rev A and 024 Rev A received 29th January 2020, 003 Rev B, 004 Rev B, 005 Rev B, 006 Rev B, 021, 022 Rev B, 0004 Rev PO7, 0005 Rev PO5 received 27th February 2020 and 0003 Rev PO7 received 28th February 2020.

 

GROUND;

To secure the proper development of the area.

 

 3  If, during development, significant contamination is suspected or found to be present at the site, then works shall cease, and this contamination shall be fully assessed and an appropriate remediation scheme agreed with the Local Planning Authority. The approved works shall be implemented within a timetable agreed by the Local Planning Authority and shall be of such a nature as to render harmless the identified contamination given the proposed end use of the site and surrounding environment, including controlled waters.  Prior to first occupation/use and following completion of approved measures, a verification report shall be submitted to the Local Planning Authority for approval.

 

GROUND;

To ensure that the proposed development will not cause harm to human health or pollution of the environment, in accordance with DEFRA and Environment Agency document Model Procedures for the Management of Land Contamination (Contamination Report 11) and National Planning Policy Framework.

 

 4  No infiltration of surface water drainage into the ground is permitted other than with the written consent of the Local Planning Authority.  The development shall be carried out in accordance with the approved details. 

 

GROUND;

To ensure that the development does not contribute to, or is not put at unacceptable risk from, or adversely affected by, unacceptable levels of water pollution caused by mobilised contaminants from any identified contamination on site in line with paragraph 170 of the NPPF. 

 

 5  No development shall take place until details of the means of foul drainage have been submitted to and agreed in writing by the Local Planning Authority. The development shall be carried out in accordance with such details as are agreed and thereafter maintained.

 

GROUND;

To prevent pollution, in accordance with the advice contained within the National Planning Policy Framework.

 

 6  No development shall take place until a detailed sustainable surface water drainage scheme for the site has been submitted to, and approved in writing by, the Local Planning Authority.  The detailed drainage scheme shall be based on the Flood Risk and Sustainable Drainage Assessment dated August 2019 and shall demonstrate that the surface water generated by this development (for all rainfall durations and intensities up to and including the climate change adjusted critical 100 year storm) can be accommodated and disposed of within the curtilage of the site without increase to flood risk on or off site. 

 

The drainage scheme shall also  demonstrate (with reference to published guidance: 

 

That silt and pollutants resulting from the site use can be adequately managed to ensure there is no pollution risks to receiving waters; 

 

Appropriate operational, maintenance and access requirements for each drainage feature or SUDS component are adequately considered, including any proposed arrangements for future adoption by any public body or statutory undertaker. 

 

The drainage scheme shall be implemented in accordance with the approved details. 

 

GROUND;

To ensure the development is served by satisfactorily arrangements for the disposal of surface water and to ensure that the development does not exacerbate the risk of on/off site flooding.

 

 7  No building or any phase of the development hereby permitted shall be occupied until a Verification Report, pertaining to the surface water drainage system and prepared by a suitably competent person, has been submitted to, and approved by the Local Planning Authority.  The report shall demonstrate the suitable modelled operation of the drainage system where the system constructed is different to that approved.  The report shall contain information and evidence (including photographs) of details and locations of inlets, outlets and control structures, landscape plans, full as built drawings, information pertinent to the installation of those items identified on the critical drainage assets drawing and the submission of an operational and maintenance manual manual for the sustainable drainage scheme as constructed. 

 

GROUND;

To ensure that flood risks from development to the future users of the land and neighbouring land are minimised, together with those risks to controlled waters, property and ecological systems, and to ensure that the development as constructed is compliant with and subsequently maintained pursuant to the requirements of paragraph 165 of the NPPF. 

 

 8  No development shall take place until the applicant, or their agents or successors in title, has secured the implementation of:

 

(i) archaeological field evaluation works in accordance with a specification and written timetable which has first been submitted to and approved in writing by the Local Planning Authority; 

 (ii) following on from the evaluation, any safeguarding measures to ensure preservation in situ of important archaeological remains and/or further archaeological investigation and recording in accordance with a specification and timetable which has been submitted to and approved in writing by the Local Planning Authority.

 

GROUND;

To ensure that features of archaeological interest are properly examined and recorded in accordance with the advice contained within the National Planning Policy Framework.

 

 9  Prior to the installation of any external lighting a "lighting design strategy for biodiversity" for the site boundaries has been submitted to and approved in writing by the local planning authority. The lighting strategy shall

 

a)  Identify those areas/features on site that are particularly sensitive for badgers and bats and that are likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory;

b)  Show how and where external lighting will be installed so that it can be clearly demonstrated that areas to be lit will not disturb or prevent the above species using their territory.

c)  Details of the types of lighting to be used including their fittings, illumination levels and spread of light

All external lighting shall be installed in accordance with the specifications and locations set out in the strategy and these shall be maintained thereafter in accordance with the strategy.

 

GROUND;

In order to limit the impact upon protected species that may be present, in accordance with the National Planning Policy Framework. 

 

10  Prior to the first occupation of any dwelling within the development hereby approved, details of the fence holes for hedgehogs shall be submitted to and approved in writing by the Local Planning Authority. The approved details will be implemented and thereafter retained.

 

GROUND;

In the interests of nature conservation in accordance with the advice contained within paragraph 170 of the National Planning Policy Framework.

 

11  From the commencement of works, precautionary mitigation measures and/or works for badgers and other terrestrial mammals will be carried out in accordance with the details contained in sections 10.3 through to 10.5 of the Ecological Impact Assessment (Native Ecology August 2019). 

 

GROUND;

In the interests of nature conservation in accordance with the advice contained within paragraph 170 of the National Planning Policy Framework.



12  Prior to occupation, all enhancements for biodiversity will be implemented in accordance with the Biodiversity Enhancement Plan (Native Ecology August 2019).

 

GROUND;

In the interests of nature conservation in accordance with the advice contained within paragraph 170 of the National Planning Policy Framework.

 

13  Prior to the commencement of any development on site details to include the following shall be submitted to and approved by the Local Planning Authority and should be carried out in accordance with the approved details. 

 

(a) Routing of construction and delivery vehicles to / from site

(b) Parking and turning areas for construction and delivery vehicles and site personnel

(c) Timing of deliveries

(d) Provision of wheel washing facilities

(e) Temporary traffic management / signage

(f) Measures to control noise affecting nearby residents

(g) Dust control measures 

 

GROUND;

In the interests of highway safety and neighbouring amenity, in accordance with Policy D1 of the Thanet Local Plan and the National Planning Policy Framework.

 

14  The proposed roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining walls, service routes, surface water outfall, vehicle overhang margins, embankments, visibility splays, accesses, carriageway gradients, driveway gradients, car parking, street furniture and bus facilities to be laid out and constructed in accordance with details to be submitted to and approved by the Local Planning Authority. 

 

GROUND;

In the interests of highway safety and neighbouring amenity, in accordance with Policy D1 of the Thanet Local Plan and paragraphs 108, 110 and 127 the National Planning Policy Framework.

 

15  Completion of the following works between a dwelling and the adopted highway prior to first occupation of the dwelling: 

(a) Footways and/or footpaths, with the exception of the wearing course; (b) Carriageways, with the exception of the wearing course but including a turning facility, highway drainage, visibility splays, street lighting, street nameplates and highway structures (if any). 

 

GROUND;

In the interests of highway safety and neighbouring amenity, in accordance with Policy D1 of the Thanet Local Plan and paragraphs 108, 110 and 127 the National Planning Policy Framework.

 

16  Provision and maintenance of the visibility splays shown on the submitted plan (drawing ref. 1617 005 Rev B) with no obstructions over 0.6 metres above carriageway level within the splays, prior to the use of the site commencing. 

 

GROUND;

In the interests of highway safety and neighbouring amenity, in accordance with Policy D1 of the Thanet Local Plan and paragraphs 108 and 127 the National Planning Policy Framework.

 

17  Provision and permanent retention of the vehicle loading/unloading and turning facilities shown on the submitted plan (drawing ref. 6100517 Rev P06) prior to the use of the site commencing. 

 

GROUND;

In the interests of highway safety and neighbouring amenity, in accordance with Policy D1 of the Thanet Local Plan and paragraphs 110 and 127 the National Planning Policy Framework.

 

18  Provision and permanent retention of the vehicle parking spaces and/or garages shown on the submitted plan (drawing ref. 1617 004 Rev B) prior to the use of the site commencing. 

 

GROUND;

In the interests of highway safety and neighbouring amenity, in accordance with Policy D1 of the Thanet Local Plan and paragraphs 110 and 127 of the National Planning Policy Framework.

 

19  The development hereby approved shall incorporate bound surface materials for the first 5 metres of any access from the edge of the highway. 

 

GROUND;

In the interests of highway safety in accordance with paragraph 108 of the National Planning Policy Framework.

 

20  1 Electric Vehicle Charging point per residential property with dedicated parking and 1 in 10 of all non allocated parking, which shall be installed to the specification within Thanet Air Quality Technical Planning Guidance 2016. 

 

GROUND;

In the interest of air quality and amenity in accordance with EP5 of the Thanet Local Plan and paragraph 181 of the NPPF. 

 

21  No development shall take place until completion of the highway alterations shown on drawing number 6100517 Rev P05 or amended as agreed with the Local Planning Authority, has been carried out.

 

GROUND;

In the interests of highway safety in accordance with paragraph 108 of the National Planning Policy Framework.

 

22  Prior to the first occupation of the development hereby approved,  full details of both hard and soft landscape works, to include 

 

 o species, size and location of new trees, shrubs, hedges and grassed areas to be planted.

 o the treatment proposed for all hard surfaced areas beyond the limits of the highway.

 o walls, fences, other means of enclosure proposed.

 

shall be submitted to, and approved in writing by, the Local Planning Authority.

 

GROUND;

In the interests of the visual amenities of the area and to adequately integrate the development into the environment in accordance with Policies D1 and D2 of the Thanet Local Plan.

 

23  All hard and soft landscape works shall be carried out in accordance with the approved details. The works shall be carried out prior to the first occupation; of any part of the development, or in accordance with a programme of works to be agreed in writing with the Local Planning Authority. Any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased, shall be replaced in the next planting season with others of a similar size and species.

 

GROUND;

In the interests of the visual amenities of the area in accordance with Policies D1 and D2 of the Thanet Local Plan

 

24  Prior to the construction of the external surfaces of the development hereby approved samples of the materials to be used shall be submitted to, and approved in writing by, the Local Planning Authority. Development shall be carried out in accordance with the approved samples. 

 

GROUND;

In the interests of visual amenity in accordance with Policy D1 of the Thanet Local Plan

 

25  All windows serving WC's, bathrooms and ensuites in the development hereby approved shall be provided and maintained with obscured glass to a minimum level of obscurity to conform to Pilkington Glass level 4 or equivalent and shall be installed prior to first occupation of each respective dwelling hereby permitted and permanently retained thereafter.

 

GROUND:

To safeguard the privacy and amenities currently enjoyed by the occupiers of adjoining residential properties in accordance with policy D1 of the Thanet Local Plan.

 

26  Three dwellings shall be built in compliance with building regulations part M4(2) and 2 in compliance with building regulations part M4(3). 

 

GROUND:

To ensure that the type of housing complies with Policy H8 of the Thanet Local Plan 2006 and Policy QD05 of the emerging Thanet Local Plan.’”

 

Following debate, the motion was put to the vote and declared CARRIED.

 

 

 

Supporting documents: