D07 F/TH/23/1352 - Land at Staner Court, Manston Road, Ramsgate

Minutes:

PROPOSAL: Erection of 9No 3-bed and 2No 4-bed two storey dwellings, following demolition of existing garages, together with reconfiguration of parking area, alterations to informal play area and refuse storage space, and landscaping.

 

Mr Lemon spoke in favour of the application.

 

It was proposed by the Chair and seconded by the Vice-Chair:

 

THAT the officer’s recommendation be adopted, namely that the application be deferred and delegated to officers for approval subject to the following conditions:

 

1.  The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

GROUND:

In accordance with Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Purchase Act 2004).

 

2.  The proposed development shall be carried out in accordance with the submitted application as amended by the revised drawings numbered:

 

1036 Rev P12

 

Received 18 December 2023

 

2035 Rev P03

2036 Rev P03

2037 Rev P03

2038 Rev P03

 

Received 13 October 2023

 

1120 Rev P06

1121 Rev P06

1122 Rev P06

1123 Rev P06

 

1124 Rev P06

1125 Rev P06

1126 Rev P06

1127 Rev P06

1128 Rev P06

2070 Rev P06

2071 Rev P06

2072 Rev P06

2073 Rev P06

2074 Rev P06

2075 Rev P06

2076 Rev P06

 

3030 Rev P06

3031 Rev P06

3032 Rev P06

3033 Rev P06

3034 Rev P06

3035 Rev P06

3036 Rev P06

3037 Rev P06

3038 Rev P06

 

Received 10 October 2023

 

GROUND:

To secure the proper development of the area.

 

3.  Development shall not begin in any phase until a detailed sustainable surface water drainage scheme for the site has been submitted to (and approved in writing by) the local planning authority. The detailed drainage scheme shall be based upon the Civil Drainage Design Strategy prepared by Pick Everard (22/12/2023) and shall demonstrate that the surface water generated by this development (for all rainfall durations and intensities up to and including the climate change adjusted critical 100 year storm) can be accommodated and disposed of within the curtilage of the site without increase to flood risk on or off-site.

 

The drainage scheme shall also demonstrate (with reference to published guidance):

·  that silt and pollutants resulting from the site use can be adequately managed to ensure there is no pollution risk to receiving waters.

·  appropriate operational, maintenance and access requirements for each drainage feature or SuDS component are adequately considered, including any proposed arrangements for future adoption by any public body or statutory undertaker.

 

The drainage scheme shall be implemented in accordance with the approved details.

 

GROUND:

To ensure the development is served by satisfactory arrangements for the disposal of surface water and to ensure that the development does not exacerbate the risk of on/off site flooding, in accordance with Policy CC02 of the Thanet Local Plan and advice contained within the NPPF.

 

4.  No building on any phase (or within an agreed implementation schedule) of the development hereby permitted shall be occupied until a Verification Report for that phase, pertaining to the surface water drainage system and prepared by a suitably competent person, has been submitted to and approved by the Local Planning Authority. The Report shall demonstrate the suitable modelled operation of the drainage system where the system constructed is different to that approved. The Report shall contain information and evidence (including photographs) of details and locations of inlets, outlets and control structures; landscape plans; full as built drawings; information pertinent to the installation of those items identified on the critical drainage assets drawing; and, the submission of an operation and maintenance manual for the sustainable drainage scheme as constructed.

 

GROUND:

To ensure the development is served by satisfactory arrangements for the disposal of surface water and to ensure that the development does not exacerbate the risk of on/off site flooding, in accordance with Policy CC02 of the Thanet Local Plan and advice contained within the NPPF.

 

5.  Where infiltration is to be used to manage the surface water from the development hereby permitted, it will only be allowed within those parts of the site where information is submitted to demonstrate to the Local Planning Authority's satisfaction that there is no resultant unacceptable risk to controlled waters and/or ground stability. The development shall only then be carried out in accordance with the approved details.

 

GROUND:

To protect vulnerable groundwater resources in accordance with Policy SE04 of the Thanet Local Plan, and the advice contained within the National Planning Policy Framework.

 

6.  A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment shall be submitted to and approved in writing by the Local Planning Authority prior to commencement of the development. The scheme shall include details of all works to be undertaken, proposed remediation objectives and remediation criteria, a timetable of works, site management procedures and a verification plan. The scheme shall ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. The approved remediation scheme shall be carried out in accordance with the approved terms including the timetable, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority shall be given two weeks written notification of commencement of the remediation scheme works.

 

GROUND:

To ensure that the proposed site investigation, remediation and development will not cause harm to human health or pollution of the environment, in accordance with Policy SE03 of the Thanet Local Plan and the advice contained within the National Planning Policy Framework.

 

7.  Prior to the first occupation of the development, a verification report demonstrating completion of the works set out in the approved remediation scheme and the effectiveness of the remediation shall be submitted to and approved in writing by the Local Planning Authority. The report shall include results of sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met. It shall also include details of longer term monitoring of pollutant linkages and maintenance and arrangements for contingency action, as identified in the verification plan, and for the reporting of this to the Local Planning Authority.

 

GROUND:

To ensure that the proposed site investigation, remediation and development will not cause harm to human health or pollution of the environment, in accordance with Policy SE03 of the Thanet Local Plan and the advice contained within the National Planning Policy Framework.

 

8.  If, during development, significant contamination is suspected or found to be present at the site, then works shall cease, and this contamination shall be fully assessed and an appropriate remediation scheme agreed with the Local Planning Authority. The approved works shall be implemented within a timetable agreed by the Local Planning Authority and shall be of such a nature as to render harmless the identified contamination given the proposed end use of the site and surrounding environment, including controlled waters. Prior to first occupation/use and following completion of approved measures, a verification report shall be submitted to the Local Planning Authority for approval.

 

GROUND:

To ensure that the proposed development will not cause harm to human health or pollution of the environment, in accordance with Policy SE03 of the Thanet Local Plan and the advice contained within the National Planning Policy Framework.

 

9.  Piling using penetrative methods shall not be carried out other than with the written consent of the local planning authority. The development shall be carried out in accordance with the approved details.

 

GROUND:

To ensure that the proposed development will not cause harm to human health or pollution of the environment, in accordance with Policy SE03 of the Thanet Local Plan and the advice contained within the National Planning Policy Framework.

 

10.Prior to the commencement of development hereby permitted, details of the measures to be taken to protect the public sewers shall be submitted to, and approved in writing by, the Local Planning Authority. Development shall be carried out in accordance with the approved details.

 

GROUND:

To protect the district's groundwater, in accordance with Policy SE04 of the Thanet Local Plan, and the advice contained within the National Planning Policy Framework.

 

11.No development shall take place until details of the means of foul drainage have been submitted to and agreed in writing by the Local Planning Authority. The development shall be carried out in accordance with such details as are agreed and thereafter maintained.

 

GROUND:

To protect the district's groundwater, in accordance with Policy SE04 of the Thanet Local Plan, and the advice contained within the National Planning Policy Framework.

 

12.Prior to the first occupation of the development hereby approved, full details of both hard and soft landscape works, to include:

A.  species, size and location of new trees, shrubs, hedges and grassed areas to be planted,

B.  the treatment proposed for all hard surfaced areas beyond the limits of the highway,

C.  walls, fences, other means of enclosure proposed,

D.  ecological enhancements to be provided within the sit, to include the measures recommended in section 9 of the Preliminary Ecological Appraisal (Lloyd Bore March 2023),

E.  details of the community garden,

F.  details of the informal playspace,

shall be submitted to, and approved in writing by, the Local Planning Authority.

 

GROUND:

In the interests of the visual amenities of the area and to make a positive contribution to biodiversity, in accordance with Policies QD02 and SP30 of the Thanet Local Plan, and the advice as contained within the NPPF.

 

13.All hard and soft landscape works, including ecological enhancement features, shall be carried out in accordance with the approved details. The works shall be carried out and completed in accordance with a programme of works to be submitted to and approved in writing by the Local Planning Authority.

 

Following completion of the landscape and enhancement works, photographic evidence of implementation shall be submitted to and approved in writing by the Local Planning Authority in order to verify the works have been completed in accordance with the approved plans, and to enable the full discharge of this condition. Any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased, shall be replaced in the next planting season with others of a similar size and species as those originally planted, unless written approval to any variation is provided by the Local Planning Authority. All ecological enhancement features shall thereafter be maintained.

 

GROUND:

In the interests of the visual amenities of the area, biodiversity enhancement, and to adequately integrate the development into the environment in accordance with Policies QD02, SP30 and GI04 of the Thanet Local Plan.

 

14.Prior to the construction of the external surfaces of the development hereby approved samples the materials to be used in the construction of the building(s) shall be submitted to, and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved samples unless otherwise agreed in writing by the Local Planning Authority.

 

GROUND:

In the interests of visual amenity in accordance with Policy QD02 of the Thanet Local Plan.

 

15.Prior to the commencement of the development a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The Construction Environmental Management Plan shall include the mitigation measures as set out within Appendix D of the Air Quality Assessment, along with the following details:

A.  Routing of construction and delivery vehicles to / from site

B.  Parking and turning areas for construction and delivery vehicles and site personnel

C.  Timing of deliveries

D.  Provision of wheel washing facilities

E.  Temporary traffic management / signage

F.  Measures to control noise affecting nearby residents

G.  Dust control measures

H.  Access arrangements

I.  Parking availability for existing residents during construction works

 

Development shall be carried out in accordance with the approved details.

 

GROUND:

In the interests of highway safety and neighbouring amenity, in accordance with Policy QD03 of the Thanet Local Plan and the advice contained within the NPPF.

 

16.The development hereby permitted shall incorporate measures to prevent the discharge of surface water onto the highway.

 

GROUND:

In the interests of highway safety, in accordance with the advice contained within the NPPF.

 

17.The area shown on the approved plan numbered 1036 Rev P12 for vehicle parking and manoeuvring areas, shall be kept available for such use at all times and such land and access thereto shall be provided prior to the first occupation of the dwellings hereby permitted.

 

GROUND:

To provide satisfactory off street parking for vehicles in accordance with Policy TP06 of the Thanet Local Plan and the advice contained within the NPPF.

 

18.Prior to the 1036 Rev P12 of the development, the secure cycle parking facilities, as shown on approved drawing no. shall be provided and thereafter maintained.

 

GROUND:

To promote cycling as an alternative form of transport, in accordance with Policy TP03 and SP43 of the Thanet Local Plan.

 

19.The escape road/footpath as shown on the approved plan numbered 1036 Rev P12 shall only be used by vehicles when a fire tender is blocking the main access road. Removable bollards shall be installed at either end of the escape road, which shall only be removed when the escape road is in use by vehicles. The removable bollards shall thereafter be maintained.

 

GROUND:

In the interests of highway safety and residential amenity, in accordance with the advice contained within the NPPF.

 

20.The area shown hatched (both existing and new) on the submitted site plan numbered 1036 Rev P12, shall be marked on site prior to the first occupation of the development hereby permitted, and thereafter maintained for emergency vehicles only.

 

GROUND:

In the interests of public safety by enabling access for fire tender vehicles.

 

21.Prior to the first occupation of the development hereby permitted, details of a pedestrian crossing point to be provided at the junction of Staner Court and Manston Road, shall be submitted to, and approved in writing by, the Local Planning Authority. The pedestrian crossing point shall be provided prior to the first occupation of the development.

 

GROUND:

In the interests of pedestrian movement and safety, in accordance with Policy TP02 of the Thanet Local Plan.

 

22.No further alterations or extensions to the roof of unit numbers 4-7, whether approved by Class B or C of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking and re-enacting that Order), shall be carried out without the prior permission in writing of the Local Planning Authority.

 

GROUND:

To safeguard the residential amenities currently enjoyed by the occupiers of nearby residential properties in accordance with Policy QD03 of the Thanet Local Plan.

 

23.The development hereby permitted shall be constructed to a high standard of energy efficiency to the equivalent of Level 4 of the Code for Sustainable Homes, unless otherwise agreed in writing by the Local Planning Authority.

 

GROUND:

All new buildings and conversions of existing buildings must be designed to reduce emissions of greenhouse gases and have resilience to function in a changing climate, in accordance with Policy QD01 of the Thanet Local Plan.

 

24.The development hereby permitted shall be constructed in order to meet the required technical standard for water efficiency of 110litres/person/day, thereby Part G2 Part 36 (2b) of Schedule 1 Regulation 36 to the Building Regulations 2010, as amended, applies.

 

GROUND:

Thanet is within a water stress area as identified by the Environment Agency, and therefore new developments will be expected to meet the water efficiency optional requirement of 110litre /person/day, in accordance with Policy QD04 of the Thanet Local Plan.

 

25.Prior to the commencement of the development hereby permitted, details of the electric vehicle charging points to be provided within the development, including their location and design, shall be submitted to and approved in writing by the Local Planning Authority. The electric vehicle charging points shall be in the form of one active charging point per allocated parking space, and one active charging point per ten unallocated parking spaces. The electric vehicle charging points shall be provided prior to the first occupation of the development and thereafter maintained.

 

GROUND:

To protect air quality, in accordance with Policy SE05 of the Thanet Local Plan and the advice as contained within the NPPF.

 

Upon being put to the vote, the motion was declared CARRIED.